A3 gate detail, retail and the latest mosque site now join the current terminal, Metro, circulation and accommodation work.
What changed
A3 visual candidate 01
South and arrivals retail candidate 03 / v1.8
Mosque destination candidate 06
Mosque connected plaza · captured in the consolidated browser build.Arrivals Costa Coffee · captured in the consolidated browser build.A3 holding-area entrance · captured in the consolidated browser build.A3 journey and follow camera · captured in the consolidated browser build.
What this build retains
Terminal immigration and baggage reclaim refinements
Metro station, train service and return journey
Public lifts, escalators and all eight bridge belts
Accommodation lifecycle 1.0 on the shared clock
Verification and scope
100 selected automated regression entries passed, including corrected evidence-path reruns
A3, mosque and bridge route geometry checked; A3 and mosque checks include new retail geometry
1,500 Explore identities retained across 181,500 sampled poses with retail fixture exclusions
The retail reference panel now yields to the main drawer, and the new shop geometry stays present during airport journeys.
Known limits and work still separate
Airport and station dimensions, lift-stop inventories and retail placement remain reconstructions.
Schedules, capacity and service assumptions remain synthetic; this is not live airport operations.
Broader Metro footprint correction, the separate navigation redesign and further crowd work are not included.
Geometry checks cover authored routes and sampled body/bag sizes; they are not accessibility certification or a device FPS guarantee.
Older candidates are retained
Source candidates and their evidence remain frozen in the local workspace. The previous accommodation main is retained as rollback. Existing hosted Sites are unchanged.
Future iterations can update the consolidated Site at the same address. A candidate being included here does not overwrite its original checkpoint or upgrade uncertain source evidence to verified fact.